JKRCGroup

Basement Underpinning

Lower the basement floor and add real ceiling height, engineered and permitted.

Our approach

How we do it, in order.

  1. 01

    Engineer

    A structural engineer designs the underpinning sequence before anything is dug.

  2. 02

    Excavate & pour

    Sections are dug and poured in sequence so the structure above stays fully supported.

  3. 03

    Finish

    New slab poured to the lowered height, ready for a finished basement or suite.

What it gets you

Why it matters.

  • 01Adds legal ceiling height for a basement suite
  • 02Increases usable square footage without a home addition
  • 03Engineered and permitted, not just excavated

Before you book

Questions we hear most.

Something specific to your building? Speak directly with a project manager or book a site visit.

Typically 12–24 inches, engineer-dependent.

Most homes take 6–10 weeks.

Yes — we pull permits and coordinate engineering and inspections.

More in Structural

Let's talk about your building.

One conversation with the people who will actually be on site. Emergency leaks answered around the clock.