Asphalt Paving
Commercial and residential hot-mix asphalt paving with deep-compacted base preparation and clean stone borders.

Our approach
How we do it, in order.
- 01
Excavation & Base Prep
Full removal of degraded surfaces and installation of heavy compacted aggregate sub-base.

- 02
Hot-Mix Paving
Premium hot-mix asphalt laid at optimal temperatures to ensure density, bonding, and smooth transitions.

- 03
Heavy Rolling
Multi-pass vibratory roller compaction gives a uniform, water-shedding surface built for heavy loads.


What it gets you
Why it matters.
- 01Seamless, resilient surface that flexes with freeze-thaw ground movements
- 02Pairs cleanly with interlocking stone borders and concrete curbs
- 03Fast installation and ready for light use in 48 to 72 hours
Before you book
Questions we hear most.
Something specific to your building? Speak directly with a project manager or book a site visit.
We recommend keeping vehicles off the newly paved surface for at least 3–5 days, especially in warm summer temperatures.
Yes — stone curbs and paver aprons along asphalt driveways are one of our most popular curb appeal combinations.
With proper base compaction and regular sealcoating every 2–3 years, an asphalt driveway lasts 15 to 25 years.
More in Concrete Stone and Retaining Wall