JKRCGroup

Asphalt Paving

Commercial and residential hot-mix asphalt paving with deep-compacted base preparation and clean stone borders.

Asphalt Paving

Our approach

How we do it, in order.

  1. 01

    Excavation & Base Prep

    Full removal of degraded surfaces and installation of heavy compacted aggregate sub-base.

  2. 02

    Hot-Mix Paving

    Premium hot-mix asphalt laid at optimal temperatures to ensure density, bonding, and smooth transitions.

  3. 03

    Heavy Rolling

    Multi-pass vibratory roller compaction gives a uniform, water-shedding surface built for heavy loads.

What it gets you

Why it matters.

  • 01Seamless, resilient surface that flexes with freeze-thaw ground movements
  • 02Pairs cleanly with interlocking stone borders and concrete curbs
  • 03Fast installation and ready for light use in 48 to 72 hours

Before you book

Questions we hear most.

Something specific to your building? Speak directly with a project manager or book a site visit.

We recommend keeping vehicles off the newly paved surface for at least 3–5 days, especially in warm summer temperatures.

Yes — stone curbs and paver aprons along asphalt driveways are one of our most popular curb appeal combinations.

With proper base compaction and regular sealcoating every 2–3 years, an asphalt driveway lasts 15 to 25 years.

More in Concrete Stone and Retaining Wall

Let's talk about your building.

One conversation with the people who will actually be on site. Emergency leaks answered around the clock.